NPS Graduate Student Theses & Reports Collection home page

Logo
Graduate students at the Naval Postgradaute School (NPS) are an integral part of research conducted through the Acquisition Research Program (ARP).

Approved for public release; distribution is unlimited. Prepared for the Naval Postgraduate School, Monterey, CA 93943

Browse
Subscribe to this collection to receive daily e-mail notification of new additions RSS Feed RSS Feed RSS Feed
Collection's Items (Sorted by Submit Date in Descending order): 741 to 760 of 901
Issue DateTitleAuthor(s)
2014-03-18NPS Government Purchase Card Program: An Analysis of Internal ControlsAlana M. Tweed
2014-05-01Analysis of Trends From DoD-Level Peer-Reviewed ContractsAdam G. Blevins
2006-06-01Financing the DOD Acquisition Budget: Innovative Uses of Public-Private PartnershipsPatrick Jankowski; Matthew Lehmann; Michael P. McGee
2014-03-04Quantitative and Qualitative Hiring Freeze Outcomes at the U.S. Army Mission and Installation Contracting CommandJacqueline Evans; Ezra Hatch
2014-03-06Reducing Costs and Increasing Productivity in Ship Maintenance Using Product Lifecycle Management, 3D Laser Scanning, and 3D PrintingCameron J. Mackley
2013-12-09Life-Cycle Cost Analysis for Small Unmanned Aircraft Systems Deployed Aboard Coast Guard CuttersTheodore J. Erdman; Christopher Mitchum
2013-12-04Drivers of Complexity in Humanitarian OperationsJon K. Christensen; Jody K. Young
2013-12-04Worldwide Husbanding Process Improvement: Comparative Analysis of Contracting MethodologiesEric Henzler; Mark Williams
2013-12-04A Cost Analysis for Life-Cycle Preventive Maintenance, Administrative Storage, and Condition-Based Maintenance for the U.S. Marine Corps Medium Tactical Vehicle ReplacementPaul Goguen; Scott Purcell
2013-12-03Analysis of Marine Corps Renewable Energy Planning to Meet Installation Energy Security RequirementsChristopher M. Chisom; Jack C. Templeton
2013-11-22Army Aviation Equipment Useful Life Cost Benefit AnalysisPatrick Baker; Bryan Riddle; Jeremy Scott
2013-12-03Case Study of the U.S. Army's Should-Cost Management ImplementationYeong M. Choi; Jason A. Morneault; Daniel J. Poole
2013-11-21Cost Benefit Analysis of Marine Corps Search and Rescue (SAR): A Study of Alternatives for Marine Corps Air Stations at Cherry Point and YumaClinton Collins; Robert Williamson
2013-11-20How Can We Best Achieve Contracting Unity of Effort in the CENTCOM Area of Responsibility?Isaac Torres; Marvin Ross
2013-11-20Optimizing Logistics Support for Ballistic Missile Defense Ships in Sixth FleetJulio Alarcon; Timothy Boston
2013-11-19Improving Rapid Acquisition: A Review of the Riverine Command Boat ProcurementWalter Laptew; DeAundrae Rogers; Jason Ross
2006-06-01San DiegoJacqueline M. Meyer; Sefa Demirel
2013-11-17Analysis of United States Marine Corps Operations in Support of Humanitarian Assistance and Disaster ReliefJared R. Gastrock; Juan J. Iturriaga
2013-11-14Building a Capabilities Network to Improve Disaster Preparation Efforts in the Southern Command (SOUTHCOM) Area of Responsibility (AOR)Timothy Fitz-Gerald Jr.; Terry D. Harper; Lance Koelkebeck
2013-11-10Management Levers That Drive Services Contracting SuccessJeffrey Hart; Adam Stover; Trenton Wilhite
Collection's Items (Sorted by Submit Date in Descending order): 741 to 760 of 901