NPS Graduate Student Theses & Reports Collection home page

Logo
Graduate students at the Naval Postgradaute School (NPS) are an integral part of research conducted through the Acquisition Research Program (ARP).

Approved for public release; distribution is unlimited. Prepared for the Naval Postgraduate School, Monterey, CA 93943

Browse
Subscribe to this collection to receive daily e-mail notification of new additions RSS Feed RSS Feed RSS Feed
Collection's Items (Sorted by Submit Date in Descending order): 821 to 840 of 903
Issue DateTitleAuthor(s)
2011-12-16Analyzing Cost, Schedule, and Engineering Variances on Acquisition ProgramsWilliam E. Griffin; Michael R. Schilling
2012-03-27Analysis of the Sustainment Organization and Process for the Marine Corps RQ-11B Raven Small Unmanned Aircraft System (SUAS)Jeffery Van Bourgondien
2005-12-01Defining Success: The Air Force Information Technology Commodity CouncilCasey A. Cortese; Heather Shelby; Timothy J. Strobel
2011-12-15The Nett Warrior System: A Case Study for the Acquisition of Soldier SystemsJoseph L. Rosen; Jason W. Walsh
2011-12-15Analysis of U.S. Military Helicopter Operations in Support of Humanitarian Assistance and Disaster ReliefCharles Fisher; Thomas Clementson
2011-12-03Logistics and Maintenance Options to Support the P-8A Poseidon's Expeditionary MissionNathanael E. Leon; Todd N. Paulson
2011-12-02Analyzing Commodity Council Development and Implementation: The Air Force Furnishings Commodity CouncilMichael A. Mealiff; Neal D. Wall
2011-12-06Procurement Integrity in Contingency Operations: A Case Study of Army Contracting Officer Corruption in Operations Iraqi and Enduring Freedom Utilizing Occupational Fraud TheoryAmanda H. Flint
2011-12-01Analysis of United States Air Forces Central Government Purchase Card Reachback ViabilityJason R. Ackiss; V. Pavan Balaji
2011-11-25A Business Case Analysis for Upgrading the Current Aerial Reconnaissance Fleet to the Q400 AircraftDaniel Ramos; Adam Moodie
2011-11-29Conquering the Iron Mountain: Reducing the Marine Expeditionary Unit's Logistics Footprint Within the Amphibious Readiness GroupChristopher Daniels; Michael Manning
2011-11-30A Decision Model for Merging Base Operations: Outsourcing Pest Management on Joint Base Anacostia-BollingShane H. Derby; Michael C. Bishop
2011-11-10Mission and Installation Contracting Command Services Acquisition: Empirical Analysis of Army Service Contract Management PracticesMichelle Ramos; Joshua Nabors
2011-11-10Green Acquisition Gap Analysis of the United States Air Force Operational Contracting OrganizationsAmanda L. DeLancey; Caitlin E. Harris; Andrew J. Ramsey
2005-12-01Reducing Cycle Time and Increasing Value Through the Application of KVA Methodology to the US Navy Shipyard Planning ProcessChristine L. Komoroski
2011-11-16Enhancing the Enhanced Scenario-Based Method of Cost- Risk AnalysisSeth T. Hooper
2011-11-05Analysis of Historical Materiel Return Program (MRP) Credits at the 1st Marine Logistics Group Reparable Issue Point (RIP)John D. Draper; Edward M. Caricato
2011-11-03The Future of Unmanned Aircraft Systems in Support of the Marine Expeditionary UnitLeslie T. Payton
2011-11-09Joint-Base Contracting: A Comparative Analysis of Joint-Base Contracting Activities Between ServicesBryce J. Fiacco; Daniel O. Stephens
2011-11-06Marines Vs. Contractors: An Analysis of a Supply Outsourcing Initiative and Its Impact on Cost and EfficiencyRobert Dinwoodie; Dennis Herold
Collection's Items (Sorted by Submit Date in Descending order): 821 to 840 of 903