https://dair.nps.edu/handle/123456789/432| Title: | Unintended Consequences of Advocating Use of Fixed-Price Contracts in Defense Acquisition Practice |
| Authors: | Chong Wang Joseph San Miguel |
| Keywords: | MDAP Cost Plus Contracts Defense Procurement System Fixed Price Contracts |
| Issue Date: | 30-Apr-2011 |
| Publisher: | Acquisition Research Program |
| Citation: | Published--Unlimited Distribution |
| Series/Report no.: | Fixed-price SYM-AM-11-031 |
| Abstract: | Frequent and substantial cost overruns in Major Defense Acquisition Programs (MDAP) have been criticized by the administration, lawmakers, and taxpayers. Critics often blame the dominant use of cost-plus contracts in the defense procurement system as the root cause of the inefficiency. In turn, a strong preference for fixed-price contracts as opposed to cost-plus contracts has been expressed on multiple occasions. In this research, we highlight the possible unintended consequences of advocating wider use of fixed-price contracts in Department of Defense (DoD) acquisitions. The implication of this study is that the mindset that fixed-price contracts are better than cost-plus contracts is misleading and can potentially do more harm than good in DoD major weapon system acquisition. |
| Description: | Acquisition Management / NPS Faculty Research |
| URI: | https://dair.nps.edu/handle/123456789/432 |
| Appears in Collections: | Annual Acquisition Research Symposium Proceedings & Presentations |