Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/2031
Full metadata record
DC FieldValueLanguage
dc.contributor.authorJeffery Van Bourgondien
dc.date.accessioned2020-03-16T18:07:47Z-
dc.date.available2020-03-16T18:07:47Z-
dc.date.issued2012-03-27
dc.identifier.citationPublished--Unlimited Distribution
dc.identifier.urihttps://dair.nps.edu/handle/123456789/2031-
dc.descriptionLogistics Management / Graduate Student Research
dc.description.abstractThe purpose of this study is to outline and analyze the acquisition and sustainment process for the current U.S. Marine Corps RQ-11B Raven Digital Data Link small unmanned aerial system program. The current sustainment of the Marine Corps Raven evolved from the support employed for its predecessor analog variant in 2008, which was originally supported by Marine organic assets below depot-level maintenance requirements. The Raven's manufacturer, AeroVironment, Inc., now stations a field service representative in theater and has been under a contractor logistics support contract since around June 2011 after the Marine Corps struggled to implement organic support and sustain its Ravens at the organizational and intermediate levels. This report serves as a case study for insights into the acquisition strategies for future unmanned systems. I explore the advantages and limitations of organic versus contractor support options in the form of monetary, organizational, and logistical resource allocation by analyzing the spectrum of solutions throughout the supply and maintenance constructs. The analysis covers both operational and sustainment perspectives through the lens of doctrine, organization, training, material, leadership and education, personnel, and facilities implications.
dc.description.sponsorshipAcquisition Research Program
dc.languageEnglish (United States)
dc.publisherAcquisition Research Program
dc.relation.ispartofseriesAcquisition & Sustainment Process
dc.relation.ispartofseriesNPS-LM-12-010
dc.subjectAcquisition and Sustainment Process
dc.subjectUSMC
dc.subjectAerial System Program
dc.subjectRQ-11B Raven
dc.subjectUnmanned Systems
dc.subjectOrganic
dc.subjectContractor Support
dc.subjectSupply and Maintenance
dc.subjectOperational
dc.subjectSustainment
dc.titleAnalysis of the Sustainment Organization and Process for the Marine Corps RQ-11B Raven Small Unmanned Aircraft System (SUAS)
dc.typeTechnical Report
Appears in Collections:NPS Graduate Student Theses & Reports

Files in This Item:
File SizeFormat 
NPS-LM-12-010.pdf1.14 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.