Please use this identifier to cite or link to this item:
https://dair.nps.edu/handle/123456789/52| Title: | An Enterprise Model of Rising Ship Costs: Loss of Learning Due to Time between Ships and Labor Force Instability |
| Authors: | Richard L. Coleman Jessica R. Summerville Bethia L. Cullis Eric R. Druker Gabriel B. Rutledge Peter J. Braxton |
| Keywords: | Cost Estimation |
| Issue Date: | 1-May-2007 |
| Publisher: | Acquisition Research Program |
| Citation: | Published--Unlimited Distribution |
| Series/Report no.: | Cost Estimating NPS-AM-07-140 |
| Abstract: | Symposium Presentation |
| Description: | Acquisition Management / Grant-funded Research |
| URI: | https://dair.nps.edu/handle/123456789/52 |
| Appears in Collections: | Annual Acquisition Research Symposium Proceedings & Presentations |
Files in This Item:
| File | Size | Format | |
|---|---|---|---|
| NPS-AM-07-140.pdf | 300.39 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.