Please use this identifier to cite or link to this item:
https://dair.nps.edu/handle/123456789/5622Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Steven Gillham, Christopher Fuchs | - |
| dc.contributor.author | Kailee Bird In Ground | - |
| dc.date.accessioned | 2026-08-06T18:37:21Z | - |
| dc.date.available | 2026-08-06T18:37:21Z | - |
| dc.date.issued | 2026-08-06 | - |
| dc.identifier.citation | APA 7 | en_US |
| dc.identifier.uri | https://dair.nps.edu/handle/123456789/5622 | - |
| dc.description | Acquisition Management / Students | en_US |
| dc.description.abstract | The U.S. Navy’s Hybrid Fleet concept and the DoD’s demand for attritable unmanned systems require a domestic industrial base capable of rapidly producing small- to medium-sized unmanned surface vessels (USVs). This thesis hypothesizes that current U.S. manufacturing capacity, shaped by foreign component dependence, workforce shortages, and fragmented production infrastructure, is insufficient to scale USV output to operational requirements. The study uses a mixed-methods approach, including a historical review of industrial mobilization, Bill of Materials (BOM) risk scoring, North American Industry Classification System (NAICS) labor force analysis, and industry engagement. Results indicate significant constraints in electronics and energy components, limited surge capacity among U.S. manufacturers, and acquisition timelines that do not incentivize scalable production. The thesis concludes that the U.S. has several challenges that it must address now to ensure that future USV demands are met. Key recommendations include domestic investment in high-risk components, expanding the workforce pipeline, implementing modular production lines, improving supply chain visibility, and synchronizing government furnished payload to vessel acquisition timelines. | en_US |
| dc.description.sponsorship | ARP | en_US |
| dc.language.iso | en_US | en_US |
| dc.publisher | Acquisition Research Program | en_US |
| dc.relation.ispartofseries | Acquisition Management;NPS-AM-26-269 | - |
| dc.relation.ispartofseries | Poster;NPS-AM-26-270 | - |
| dc.subject | unmanned maritime systems | en_US |
| dc.subject | UMS | en_US |
| dc.subject | unmanned surface vessel | en_US |
| dc.subject | USV | en_US |
| dc.subject | Bill of Materials | en_US |
| dc.subject | BOM | en_US |
| dc.title | Preparing the U.S. Industrial Base for Large-Scale Manufacturing of Small-To Medium-Sized Unmanned Surface Vessels | en_US |
| dc.type | Presentation | en_US |
| dc.type | Thesis | en_US |
| Appears in Collections: | NPS Graduate Student Theses & Reports | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| NPS-AM-26-269.pdf | Student Thesis | 7.25 MB | Adobe PDF | View/Open |
| NPS-AM-26-270_Poster.pdf | Student Poster | 769.41 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.